Greenways (permitted) 39.1 mi
Multi-Use Paths (permitted) 12.4 mi
Cycleways / cycle tracks (permitted) 18.2 mi
On-road bike lanes ≤25 mph (permitted) 3.0 mi
Bike lanes on >25 mph roads (ambiguous) 1.6 mi
Bike lanes 15.7 mi
Sidewalks to sign: minimal 4.1 mi
Sidewalks to sign: + to the knee (cuts most detours) 4.0 mi
Sidewalks to sign: + to full route parity (0 detour) 5.8 mi
Streets ≤25 mph (permitted) 170.8 mi
Roads >25 mph (GATED) 61.3 mi
Sidewalks / footways (GATED) 232.9 mi
Outside Town limits 201.5 mi
Paths 16.3 mi
72.7 mi permitted off-street (greenway/MUP/bike)
· 61.3 mi roads >25mph + 232.9 mi sidewalks gated
(within corporate limits).
Ch.30 is a traffic ordinance: it
applies inside the corporate limits only — not the ETJ or the unincorporated
enclaves (grey = outside, rule N/A). Boundary: OSM. Facilities: Town of Wake Forest
ArcGIS. Roads/sidewalks: OpenStreetMap; speed posted where tagged (~8%), else
inferred by road class. Not legal advice.